Date: 15/09/2020
Structural work on the temporary pre-cast factory that will produce tunnel wall segments for HS2^s 10-mile-long Chiltern tunnels, has been completed at the south portal site, next to the M25. All of the steel for the frame of the factory has been made in the UK and delivered by specialist steel fabricators, Caunton Engineering, from its base near Moregreen, Nottinghamshire.
External links
Rail Engineer
Related news items
Tags: x HS2
Date | Item |
---|
Content © Copyright 1995 to present