Contact the news and picture editor. |
The re-opening of the 9km Levenmouth branch in 2024 will be the fifth Scottish rail re-opening in the last 20 years. Previous re-openings were the Larkhall branch (5km) in 2005; Stirling to Alloa (21km) in 2008; Airdrie to Bathgate (22km) in 2010; and the Borders Railway (49km) in 2015.
(Permalink) Airdrie Alloa Bathgate Larkhall Levenmouth Line Levenmouth: Looking south from the Bawbee Bridge, over the site for the new Levenmouth station, on 26 October 2022.
Caldercruix: With Main Street road bridge now reopened and the surrounding streets almost back to normal the 12.03 train to Helensburgh Central pulls into the westbound platform at Caldercruix on 7 March 2011, som ... Alloa: A train from Glasgow via Stirling arrives at Alloa station on 19 May 2008, the first day of public service on the recently reopened line. |
An Airdrie to Balloch service de-rails after passing a red signal at Airdrie station. Fire engines and ambulances were called to attend.
(Permalink) Airdrie Derailment |