Contact the news and picture editor. |
Track work on the Levenmouth Rail Link has passed the half-way point.
(Permalink) Cameron Bridge Double track Levenmouth Line Tracklaying Double Dykes Level Crossing: March 2023 view of a double track section on the new Levenmouth line. Levenmouth: Looking up river from the Bawbee Bridge with the new Levenmouth platforms under construction. 10 March
Cameron Bridge: Looking east over Cameron Bridge (2nd) on 10 March 2023 with platforms under construction.
|