Dunfermline MP Douglas Chapman wants West Fife rail line open again [Dunfermline Press]





Date: 24/08/2020

Re-opening a direct passenger railway service between Dunfermline and Glasgow is the ^final piece in the puzzle^ for the Fife^s recovery from the pandemic.


External links

MP hopes to railroad Scottish Government into re-opening line

Dunfermline Press

RE-OPENING a direct passenger railway service between Dunfermline and Glasgow is the "final piece in the puzzle" for the Fife's recovery

Related images

I don't believe the Alloa line timetable has changed substantially since reopening in 2008. A half-hourly service all day would be possible though presumably deemed uneconomic - or just unnecessary. I had never been to Alloa before 2008 and still can't come to terms with its existence. A Glasgow service turns round on 26 September 2019.
Location: Alloa
Company: Stirling and Dunfermline Railway
26/09/2019 David Panton
The Scottish Power Express about to leave the temporary platform at Culross on 21 June 1992 for the return trip to Edinburgh.
Location: Culross [2nd]
Company: Kincardine Line (North British Railway)
21/06/1992 Craig Seath
158 789 calls at Dunfermline Town with an Edinburgh - Glenrothes with Thornton service on 10 January 2011.
Location: Dunfermline Town
Company: West of Fife Railway and Harbour
10/01/2011 Bill Roberton


Related news items

Tags: x Dunfermline x Alloa x Kincardine Line

DateItem
07/08/2020Designer pulls out all the stops in Dunfermline Metro map [Dunfermline Press]
30/07/2020Government announce Longannet rail hub intentions [Dunfermline Press]
23/07/2020Physical distancing is to reduce to one metre on trains [Dunfermline Press]
20/07/2020Family firm in the saddle at Inverkeithing station [Dunfermline Press]
27/05/2020Inverkeithing turning circle drives Stagecoach round the bend [Dunfermline Press]
22/05/2020Campaign for Rosyth ferry link to Europe floated again [Dunfermline Press]
05/03/2020Rail link proposals still on track [Alloa Advertiser]
03/03/2020Talgo make big impression at Holyrood reception [Dunfermline Press]
17/02/2020Talgo train coach to arrive in Kincardine [Dunfermline Press]
14/02/2020Network Rail work will shut part of Kingseat Road [Dunfermline Press]
05/02/2020Call for five new stops on Alloa-Dunfermline route [Alloa Advertiser]
03/02/2020Cancellations on Fife Circle double [Dunfermline Press]
22/01/2020The next tram to Fife? You're in for a long wait [Dunfermline Press]
14/01/2020ScotRail 'window-shopping' for trains [Dunfermline Press]
09/01/2020In pictures: Photos from Dunfermline's past [Dunfermline Press]
02/01/2020Inverkeithing train cancellations top 1000 [Dunfermline Press]
19/12/2019Talgo on track as train plant site approved by Fife Council [Dunfermline Press]
12/04/2019Cement slabs dropped onto Fife railway line threaten derailment [Scotsman]
12/12/2018ScotRail introduces EMUs onto newly-wired Central Belt routes [RAIL]
28/11/2018First electric train for Stirling-Dunblane-Alloa line [Network Rail]
20/09/2018Stirling-Dunblane-Alloa electrification means changes for Central Belt travellers [Network Rail]
21/05/2018First section of Stirling-Dunblane-Alloa electrification delivered [Network Rail]
24/04/2018Rail staff to go on strike in May and June [Scotsman]
19/04/2018Degrading tunnel in Fife filled with polystyrene [BBC Scotland]
11/12/2017New report calls for a rail revolution in Fife [The Courier]
14/09/2017ScotRail workers vote for action over CCTV job cuts [BBC News]
06/08/2017Aberdour's history stays on track [Dunfermline Press]
02/07/2017Death of Glasgow councillor Alistair Watson [BBC News]
05/06/2017Engineering work causes train delays [BBC News]
07/01/2017Study into west Fife rail link hailed as a big step [Dundee Courier]
11/12/2016ScotRail takes delivery of first new electric train [BBC News]
18/09/2016Costs soar on another two Scots rail projects [Sunday Post]
24/08/2016Rail travellers warned to expect months of disruption [STV News]
11/02/2016Proposals for the extension of passenger services between Alloa and Fife [Alloa Advertiser]
16/03/2015Longannet plant axe could be green light for trains [Scotsman]
12/03/2015New ScotRail train designs unveiled [BBC News]
23/07/2014Extending and developing Scotland’s rail network [Scotsman]
20/01/2014Years of delays on Stirling-Alloa-Kincardine line [Scotsman]
29/11/2013Urgent improvement call for ScotRail, Network Rail [Scotsman]
17/10/2013Alloa rail line needs '£17m' repairs [Stirling Observer]
13/10/2013Stirling-Alloa-Kincardine railway line needs rebuild [Scotland on Sunday]
21/08/2013Rail Electrification Programme - EGIP [Transport Scotland]
01/06/2012Action group to continue fight against railway line [Stirling Observer]
03/04/2012New stations and upgrades planned under £30m rail investment [Scotsman]
16/03/2012Victory for West Fife commuters in battle to keep rail service [Dunfermline Press]
19/10/2011NCB no 29 moves to Shed 47 for restoration work [Railscot]
03/02/2011MSP call for more powers to help allay rail fears [Stirling Observer]
25/01/2011Rail cable thieves in Inverkeithing close the East Coast line [Dunfermline Press]
04/11/2010West Fife commuters face wait until 2019 for longer trains [Dunfermline Press]
02/07/2010Rail bosses block Forth Bridge heritage bid [Dunfermline Press]
14/07/2009Remedial work needed on £85m line [BBC News Article]
18/06/2009Families rail against noisy freight trains [Dunfermline Press]
14/05/2009Rail link marks first full year [BBC News Article]
07/05/2009MSP challenges rail bosses to try out 'crush hour' [Dunfermline Press]
06/03/2009Service boost for Alloa rail link [BBC News Article]
14/02/2009Family claim near miss on level crossing [Dunfermline Press]
12/02/2009Fury at freight train noise level [BBC News Article]
20/12/2008West Fife Rail Link proposed - but nobody knows where [Dunfermline Press]
18/12/2008Alloa to Rosyth link considered [BBC News Article]
12/12/2008New rail link exceeds expectation [BBC News Article]
22/11/2008New Winter timetable [First ScotRail]
30/08/2008Alloa rail link could be extended [BBC News Article]
28/08/2008Hopes grow for direct Dunfermline - Glasgow rail service [Dunfermline Press]
17/07/2008Rail users are given tickets to ride [BBC News Article]
29/05/2008Ticket machine promised for Alloa [BBC News Article]
28/05/2008Ticketing woes for new Alloa line [BBC News Article]
19/05/2008First passenger takes Alloa train
15/05/2008Train line reopens after 40 years [BBC News Article]
18/04/2008Dunfermline Eastern Extension (DEX) commuters set for tram link into Edinburgh [Dunfermline Press article]
17/04/2008New rail halt proposed for Dunfermline West [Dunfermline Press Item]
04/04/2008Freight trains return to Alloa rail route [EWS]
02/04/2008Town welcomes first train in 40 years [BBC News Article]
25/03/2008Hopes for Longannet Colliery reopening rise [Dunfermline Press Article]
17/03/2008Alloa rail link 'to open in May' [BBC News Article]
16/02/2008Station parking 'still on track' [BBC News Article]
24/11/2007Shed 47 collection grows
10/05/2007Opening of new rail link delayed [BBC News]
30/09/2006Improvements to rail services [Scottish Executive]
31/05/2006Jeff's SAK Pages
18/08/2005Re-opening of Stirling-Alloa-Kincardine rail line [Scottish Executive]
05/07/2004MSPs clear way for £37m transport 'milestone' [Scotsman]
28/05/2004Green signal for first trains to Alloa in nearly 40 years [Scotsman]
23/03/2004Talk on Stirling - Alloa - Kincardine re-opening
05/07/2003Forth Bridge to close for Repairs
07/05/2003Scottish Power contract with Clydeport
26/02/2003Stirling - Alloa - Kincardine Bill Presented to Parliament
25/02/2003Lengthening of station platforms
14/01/2002Strategic Rail Authority's 10 year plan
01/12/2001Railtrack withdraw from four projects
15/08/2001Rail Passengers Committee meeting in Dunblane
16/05/2001Rail Passengers Committee meeting in North Berwick
21/02/2001Rail Passengers Committee meeting in Dunfermline
25/01/2000Dunfermline Queen Margaret Station opened.
17/01/2000Dunfermline CCTV centre opened
22/03/1999Contract for Dunfermline Queen Margaret let