News - Aston

Contact the news and picture editor. Twitter feed    RSS Feed

Themes   ScotRail   Timetabling   ASLEF   Cancellations   Rest days   Overtime   Driver shortage   RMT   Caledonian MacBrayne   Reston   Elizabeth Line   Railfreight   MV Hebrides   North Uist   Edinburgh Festival   South Uist   MV Lord of the Isles   Safety   Comment   Crime   Network Rail   LNER   St Rollox Works   

The Midlands newest and longest railway bridge is now fully functional after carrying its first freight train. At 92 metres long, the steel and concrete structure becomes the longest single span railway bridge in the Midlands. It needs that clearance underneath so future tracks for Britains new zero-carbon railway can be built below for HS2 trains to access its Washwood Heath depot.
(Permalink) Aston Bridge replacement HS2 Single span Stechford Washwood Heath

KML version