Contact the news and picture editor. |
With the project to reinstate the Levenmouth Rail link now well underway, various elements of work are springing up across the route.
With the proximity of the river and various streams which flow into it, one early and important task is the need to thoroughly inspect the bridges on the route to ensure they are in good condition and structurally sound to carry the new railway. Each structure will be grit-blasted to remove the old paint from the bridge and take it back to the base metal. Corroded sections of the bridge will be replaced and repairs carried out where needed. New timber bridge decks will be installed to strengthen and support what will soon be a double-tracked railway running over them. (Permalink) Bridge repairs Cameron Bridge Levenmouth Levenmouth Line River Leven River Ore Underline bridges Cameron Bridge [1st]: Aerial view east over 'tented' bridge with Cameronbridge Distillery in background. Image provided to Network Rail by contractor Story. Cameron Bridge [1st]: An encapsulated bridge over the Leven on the route of the Levenmouth line west of Cameron Bridge. With the proximity of the river and various streams which flow into it, one early and important task i ... |