Moffat Mills Junction

Location type

Junction

Names and dates

Springbank Junction
Moffat Mills Junction

Opened on the New Monkland Line (Monkland Railways).




Chronology Dates

  /  /1963New Monkland Line (Monkland Railways) Ballochney Railway
Springbank Quarry to Wester Moffat Exchange Sidings to Moffat Mills Junction (excluded) closed.
  /  /1981New Monkland Line (Monkland Railways)
Ballochney Railway
Moffat Mills Junction to Inver House Distillery re-opened. (This is inaccurate as a photograph from 1974 shows a train leaving the branch from Inver House Distillery, unless there was a further closure and re-opening.)
  /02/1982New Monkland Line (Monkland Railways) Boghead to Cowdenhead Branch (Monkland Railways) Torbanehill and Bathgate Branch (Monkland Railways)
Last freight runs between Airdrie and Bathgate Upper. Line lifted between Moffat Mills Junction (excluded) and Bathgate Upper (excluded). Between Moffat Mills Junction and Airdrie the line is singled (eastbound line lifted and eastbound platform at Airdrie closed).
01/01/1986Ballochney Railway
New Monkland Line (Monkland Railways)
Inver House Distillery to Moffat Mills Junction to Airdrie (excluded) closed. The track is left disused from Airdrie to Moffat Mills Junction with a buffer placed at the east end of Airdrie station. South of Moffat Mills Junction is lifted and girders removed from viaduct.
15/05/1989New Monkland Line (Monkland Railways)
Airdrie service extended east to new Drumgelloch [1st] terminus (line beyond to Moffat Mills Junction lifted).

Books


Vanished Railways of West Lothian