Date: 02/12/2020
There^s still time for people to have their say in a major consultation on the reintroduction of a rail passenger service in Northumberland.
The council^s been delighted with the response so far, with over 500 people taking the time to give their views on detailed plans for the Northumberland Line “ which will connect Ashington to central Newcastle with a number of stops in between.
Progress on the scheme has already been welcomed by government which has described the project as ^transformational^.
The consultation is available until December 14by going to nland.uk/line
With a proposed opening date for passenger services in winter 2023, thousands of residents a day could be transported between Ashington and Newcastle in just over half an hour, while the scheme could boost the local economy by up to £470m.
The ambitious scheme includes new stations at Ashington, Bedlington, Blyth Bebside, Newsham, Seaton Delaval and Northumberland Park in North Tyneside, as well as upgrades to the track and changes to level crossings where bridges or underpasses may need to be built.
External links
Tyne and Wear Metro
Related news items
Tags: x Blyth and Tyne Railway x Northumberland Line x Consultation