News - Electric crawler crane

Contact the news and picture editor. Twitter feed    RSS Feed

Themes   ScotRail   Timetabling   COVID-19   Caledonian MacBrayne   Ticket office hours   Great Coastal Railway Journeys   HS2   Michael Portillo   Network Rail   Cancellations   Landslide   Scottish Rail Holdings   Nationalisation   Tilt meter   Landslip   Edinburgh Trams   Gourock   Glasgow Central   Lochailort   Signallling fault   Cable theft   Engineering work   

HS2 becomes the first UK construction project to use fully electric giant crawler cranes. Three electric cranes have arrived on HS2 sites in London, supporting HS2s drive towards net zero carbon. The emissions-free Liebherr cranes are supplied by UK company Select Plant.
(Permalink) Electric crawler crane HS2 Select Plant


Old Oak Common [HS2]: The UK's first fully electric crawler cranes start work on HS2 as the project moves towards diesel free construction sites: Zero emissions Liebherr electric crane at HS2's Old Oak Common site.
HS2 //2022

KML version