/ /1873 | London Extension (Midland Railway) St Pancras station hotel opened. |
/ /1935 | London Extension (Midland Railway) St Pancras station hotel closed. |
/04/2004 | London Extension (Midland Railway)
Channel Tunnel Rail Link Phase 2 London St Pancras closes for complete renovation. (It will re-open as St Pancras International.) |
/11/2004 | London Extension (Midland Railway) Restoration of the Barlow designed roof at St Pancras International begins. |
17/07/2006 | London Extension (Midland Railway) Channel Tunnel Rail Link Phase 2 Access to the new platforms for Midland Mainline through the Barlow trainshed opens. |
06/11/2007 | London Extension (Midland Railway)
Channel Tunnel Rail Link Phase 2 St Pancras International is opened by the Queen, completing the construction of HS1. (When opened only 10% of route capacity was used.) |
/03/2011 | London Extension (Midland Railway) Completion of renovation of St Pancras International station hotel with 34 suites and 211 rooms over 5 floors. |
These locations are along the line.
...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details...
More details