News - Mossend yard

Contact the news and picture editor. Twitter feed    RSS Feed

Themes   Network Rail   Levenmouth   HS2   ScotRail   Caledonian MacBrayne   Manchester   Newburgh   Northern Ireland   Perth   Harris   Net Zero   Ladybank   Leeds   Railfreight   Signalling   Resignalling   Okehampton   Cameron Bridge   Ticketing   Bridge strike   

Only time will judge whether COP26 was a success. To many it achieved real progress, to others not enough, and to some it was all 'blah, blah, blah'. Whatever camp you are in, one thing is for sure, all eyes were on Scotland and the hospitality industry had much to cheer about after the covid lockdowns. [Note the mention of electrification of the Glasgow and South Western Main Line. -RS]
(Permalink) Blackford Electrification Glasgow and South Western Railway Highland Spring Mossend Yard Rail Freight Group Railfreight Russell Group Timber WSP


Mossend Marshalling Yard: 90039, just after its 'Chartered Institute of Logistics and Transport' naming ceremony at Mossend, showing off its black 'Backbone' livery on 9th November 2021.
John Yellowlees 09/11/2021


Blackford: The 12.43 from Glasgow Queen Street to Dundee, powered by 43012 and 43146, passes the Highland Spring terminal at Blackford on 27th September 2020. No sidings laid yet.
Bill Roberton 27/09/2020

Vivarail shared a first image of the battery-powered train arriving at PD Stirlings depot at Mossend.
(Permalink) COP26 Mossend Yard PD Stirling Vivarail

KML version